SECTION 3
UTILITY VEHICLE
A S S E M B L Y I N S T R U C T I O N S
assembly
Qty Item
6 ¼”x¾”Socketheadbolts(steeringcap)
6 ¼”–20Nylocknuts(steeringcap)
4 ¼”x1”hexheadbolts(polybed)
10 ¼”Nylocknuts
4 ¼”x¾”Carriagebolts(steelbed)
4 ¼”Flatwashers
6 5/16”x2”socketheadbolts
12 5/16”curvedwashers
12 5/16”nylocknuts
4 5/16”x2”hexheadbolts
2 5/16”x2¼”Socketheadbolts(LM)
2 5/16”Nylocknuts(LM)
2 5/8”x4”Hexbolt
2 5/8”nylocknuts
1 Setofkeys
1 Steeringwheel(withcap)
1 Bumper
2 Rearfenders
2 Rearframestubs
1 Seatback
1 Cage
1 CargoBedwithtailgate
Wear proper eye protection during the uncrating
and assembly process to avoid potential eye injuries.
WARNING
RISK OF SERIOUS INJURY OR DEATH
The Brush Bars and the Seat and Shoulder Belt
are critical parts of the Operator / Passenger safety
system on this unit. Do not attempt to operate the
unit until all components have been properly installed.
!
WARNING
!
Your new Utility Vehicle should include
the following items to be assembled:
Step 3 Sides
Step 3 Sides
Step 1 End
Cross Supports
Step 1 End
Cross Supports
1 Uncrating the vehicle
• Wear your Safety Glasses to prevent eye injury.
• Using the Hammer and Pry Bar, remove cross supports at each end
of the crate and discard.
• Carefully pry and remove crate top and sides then discard.
2 Remove crate sides and discard
• Using Box Cutters, cut and remove the hold down ties.
• Remove seat back and other loose items from underneath unit and set
aside
• Remove the unit from the crate base and discard base.
NOTE: Some models may require installing front tires prior to removing
from crate.
3 Unpacking the components
• Unpack all of the loose components from the unit and set aside.
• Remove protective plastic from each component and discard.
Step 2 Crate Top
9
Kommentare zu diesen Handbüchern